Common Description
Equipped with the zero leak bidirectional checking sole-noid valves, this power unit is made for that operation of two independent circuits. Which are respectively for the major and subordinate platforms of your double scissors lift. Two cut-off valves are utilised for lowering the machine manually in case of energy loss. If much more independent circuits are needed for the application please make contact with us for availability.
Remark: one. Please check with our income engineer for that distinctive pump displacement, motor power or tank capacity.
2. CSA or UL licensed motors can be found upon request.
Specific Notes
1. The AC motor is of S3 duty cycle, which might only work intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
two. Clean every one of the hydraulic components concerned prior to installation of the electrical power unit.
three. Viscosity on the oil shoud be 15~46 cst,along with the oil really should be clean and free of charge of impurities,N46 hydraulic oil is suggested.
4. The electrical power unit must be mounted vertically.
5. Check the oil degree while in the tank soon after the preliminary working on the power unit.
six. Oil shifting is needed just after the first one hundred operation hrs,afterwards once every single 3000 hrs.